Power
Required Power¶
What is it?¶
The electricity needed to operate all IT and supporting equipment.
Theoretical Definition¶
The total electrical load required for IT hardware + support systems, including redundancy (UPS, generators).
Why is it Important?¶
- Downtime risk: Power loss = service outage.
- Redundant power ensures business continuity.
- Major cost factor in OPEX.
How is it Planned?¶
- Estimate rack power (3–5 kW typical, 10+ kW high density).
- Deploy UPS, generators (N+1, 2N redundancy).
- Use PDUs for safe distribution.
Impact Down the Line¶
Under-provisioning = outages; over-provisioning = wasted CAPEX.
High consumption = poor efficiency (high PUE).
Real World Example¶
In 2017, British Airways lost ~$100M after a power surge crippled its data center, halting flights worldwide.